Saudi Arabia
Solar street lights for Saudi Arabia
Minglong Solar Lighting is a manufacturer in Linyi, Shandong, China, producing
since 2010 with 300+ solar lighting models and a monthly capacity of 30,000 units. This page sets out
the solar resource at Riyadh, the import and certification route for Saudi Arabia, and the configuration
questions that decide whether a solar street light is the right answer on your site.
Verified local data
Solar resource in Saudi Arabia
In-plane irradiation is the figure used to size an off-grid light, because it describes what
the tilted panel actually receives rather than what falls on horizontal ground. The values below
come from PVGIS v5.3, the European Commission Joint Research Centre solar dataset, for a fixed
25-degree plane facing the equator - south-facing at northern-hemisphere sites and north-facing
at southern-hemisphere sites. They were cross-checked against NASA POWER for the same coordinates.
A different on-site tilt or azimuth changes the yield and should be confirmed per project.
6.61kWh/m2/day annual average
5.61lowest month, kWh/m2/day
7.38highest month, kWh/m2/day
2414kWh/m2 per year
The annual average alone does not size a light. The lowest month is what sets the
battery requirement, because that is when the panel has to recharge the battery through a run of
poor days. Send us the number of consecutive days your site needs to hold and we will size the
configuration against that figure rather than against the average.
Market entry
Import and certification requirements in Saudi Arabia
Requirements are confirmed per shipment with the importer of record.
Saudi Arabia import requirements
Scheme: SABER (SASO) - Product Certificate of Conformity and Shipment Certificate of Conformity
SABER is the mandatory platform for regulated imports into Saudi Arabia. It operates through two certificate types: a Product Certificate of Conformity, generally valid for one year and renewable, and a Shipment Certificate of Conformity valid per consignment. From 1 January 2025 all shipments to Saudi Arabia must obtain PCoC and SCoC through the platform, and certificates raised after arrival are invalidated. In June 2026 SASO published additional product labelling requirements, including the supplier name and commercial registration number.
Who handles it: The importer of record lodges the shipment certificate and holds the product certificate.
Minglong supplies the CE and RoHS documentation and the supporting test data for the technical file. Test reports for a pre-shipment scheme are expected to come from an ISO 17025 accredited laboratory.
On the ground
What the Saudi Arabia market looks like
- Solar resource
- In-plane irradiation on a 25-degree equator-facing plane averages 6.61 kWh/m2 per day in Riyadh, ranging from about 5.61 in January to about 7.38 in September (PVGIS v5.3).
- Climate
- Extremely hot and dry. The solar resource is among the strongest worldwide and stays high across the whole year.
- Grid situation
- Comprehensive coverage, so the commercial case here is running cost and carbon rather than access.
- Typical applications
- Municipal road packages, compound and perimeter lighting, industrial facilities, parking and campus lighting.
- Who buys
- Municipal EPC contractors, lighting distributors, project developers, industrial facility operators.
Product fit
Why the configuration matters here
- This is a market Minglong already exports to, so the export documentation path is established rather than being a first order.
- In-plane irradiation on a 25-degree equator-facing plane averages 6.61 kWh/m2 per day and stays above 5.61 even in the weakest month, so a stand-alone unit holds its output through the year.
Across the Minglong range the standard build is a die-cast aluminium and glass housing, IP65
protection, a monocrystalline silicon panel, a LiFePO4 battery, a 2835 LED chip at 120 LM/W for the
whole luminaire, 8-10 hours of charging, 6-8 hours of lighting per night, 2-3 days of rainy-day
backup, and an operating range of -25C to +65C. Minimum order quantity is 100 pieces with mixed
models allowed, lead time is 15-30 days, and OEM private label is supported down to logo, colour
box, outer carton and manual.
FAQ
Questions buyers ask about solar street lights in Saudi Arabia
Final model values and document applicability remain subject to confirmation.
What is the SABER certification process for solar street lights going into Saudi Arabia?
SABER is the mandatory platform run by SASO for regulated imports into Saudi Arabia, and it works on two certificate types. The Product Certificate of Conformity covers the product itself and is generally valid for one year, while the Shipment Certificate of Conformity covers each consignment. From 1 January 2025 all shipments must obtain both through the platform, and a certificate raised after the goods have arrived is invalidated. SASO also published additional labelling requirements in June 2026, including the supplier name and commercial registration number. The importer of record lodges the shipment certificate and holds the product certificate; Minglong supplies the CE and RoHS documentation and test data that support the technical file.
How much solar energy is available in Saudi Arabia?
In-plane irradiation on a 25-degree equator-facing plane in Riyadh averages 6.61 kWh/m2 per day across the year on the PVGIS v5.3 series, from about 5.61 in January to about 7.38 in September. Very few markets hold this level across a full year. The constraint here is heat and dust rather than daylight - panel soiling reduces output until the panel is cleaned - so the cleaning interval is part of the sizing conversation.
Has Minglong supplied this product to Saudi Arabia before?
Yes. Saudi Arabia is one of the three markets Minglong currently exports to, alongside Oman and the UAE, so export documentation, packing lists, test reports and certificates of origin are a routine path rather than something being set up for the first time. That matters for a buyer assessing an unfamiliar factory - the question of whether we have handled the paperwork for your market already has an answer. Tell us your project and we will put the documentation scope together with the quotation.